- No need to disassemble the connection and install the pipe inside the connection by only opening the first three threads of the connection (mounting as a push fit)
-
High speed in resolving incidents and maximum prevention of water wastage
-
Reducing the human error factor when installing connections
-
Withstanding the hydrostatic pressure test based on the INSO 21264 (ISO 17885) standard and health certification according to the ISIRI 1053 standard.
First, cut the pipe at a 90 degree angle and smooth the cut area well with a file.
Open the connection screw to the size of 3 to 4 gears.
Push the tube into the joint until it reaches the inner edge of the body.
The connection head should be completely closed to the last gear on the body. Use a whip wrench for small size connections.